Highways and Roads

Construction, closures and crashes on the main routes.

  • 13 Tracked terms
  • Last 30 days Feed window

What this topic collects on

An article joins this feed when it matches these terms. Each one is also a search of its own.

Latest in Highways and Roads


1190kex.iheart.com > featured > portland-local-news > content > 2026-09-13-i-5-southbound-closure-underway

I-5 Southbound Closure Underway

23+ hour, 1+ min ago   (96+ words) News Radio 1190 KEX I-5 southbound in Portland is now closed between I-405 and the Rose Quarter for a five week construction project. There are long delays on I-5 southbound and on I-84 westbound as traffic uses that as an alternate. MAX is a solution…...


kqennewsradio.com > 09/10/2026 > expect-delays-on-i-5-south-of-canyonville-for-hazard-tree-removal

EXPECT DELAYS ON I-5 SOUTH OF CANYONVILLE FOR HAZARD TREE REMOVAL

4+ day, 10+ hour ago   (195+ words) September 10, 2026 3:30 a.m. Drivers should expect weekday traffic delays south of Canyonville starting Monday, September 14th, as workers remove several dozen fire-damaged trees along Interstate 5. The trees were damaged by the Milepost 97 Complex Fire in 2019, and many are at risk of falling into…...


opb.org > article > 09/09/2026 > i-5-interstate-highway-closure-portland-oregon-what-to-expect

Authorities try to avoid ‘carmageddon’ during 5-week closure of I-5 southbound

5+ day, 8+ hour ago   (1652+ words) Cars drive on Interstate 5 through the Rose Quarter and on the I-5 southbound ramp to Interstate 84 in Portland, Ore., on Aug. 27, 2026. Parts of the I-5 going southbound, including these two sections, will be temporarily closed starting in September for up to five…...


katu.com > news > survive-i-5 > odot-to-stage-tow-trucks-on-i-405-as-southbound-i-5-rose-quarter-closure-starts-friday-interstate-traffic-gridlock-alert-work-driving-jam-local-oregon-portland-community

ODOT to stage tow trucks on I-405 as southbound I-5 Rose Quarter closure starts Friday

5+ day, 19+ hour ago   (231+ words) PORTLAND, Ore. (KATU) — The Oregon Department of Transportation (ODOT) says it plans to stage tow trucks and response crews along Interstate 405 during the upcoming five-week closure of southbound Interstate 5 through Portland’s Rose Quarter, aiming to quickly clear crashes or disabled…...


hometownstation.com > s1-news > c38-traffic > northbound-interstate-5-lanes-close-after-diesel-spillage-causing-major-delays-608632

Northbound Interstate 5 Lanes Close After Diesel Spillage Causing Major Delays

1+ week, 22+ hour ago   (271+ words) Posted by: Alexandra Ines in Santa Clarita Latest News, Traffic September 6, 2026 - 1:50 pm 0 7 Views Around 5:20 A.M., California Highway Patrol (CHP) received calls regarding a semi-truck spilling large amounts of diesel across northbound Interstate 5, south of Templin Highway, according to a CHP social…...


kqennewsradio.com > 09/02/2026 > odot-contractor-continues-work-on-i-5-winchester-bridge

ODOT CONTRACTOR CONTINUES WORK ON I-5 WINCHESTER BRIDGE

1+ week, 5+ day ago   (105+ words) KQEN News Radio ODOT CONTRACTOR CONTINUES WORK ON I-5 WINCHESTER BRIDGE September 2, 2026 3:20 a.m. A contractor with the Oregon Department of Transportation is continuing work on the Interstate 5 Winchester Bridges project. Dan Latham of ODOT said the project includes repair work to both…...


tauntongazette.com > story > news > traffic > 09/01/2026 > massdot-schedules-overnight-inspections-on-i-495-and-i-95 > 91551836007

Expect overnight delays on I-495 and I-95

1+ week, 6+ day ago   (204+ words) MassDOT plans overnight lane closures on Interstate 495 in Foxborough and Interstate 95 in Attleboro as crews conduct bridge-related inspections beginning Sept. 1. The work will take place between 10 p.m. Sept. 1 and 5 a.m. Sept. 2, according to a community announcement. Officials said ancillary structure inspections are…...


thenewstribune.com > news > local > traffic > article317078658.html

Traveling I-5 at night? Be ready for South Sound lane closures through October

2+ week ago   (255+ words) Get ready to shift lanes if you travel I-5 between Lacey and DuPont at night. The Washington Department of Transportation (WSDOT) has announced Tuesday through Saturday nighttime lane and ramp closures starting Tuesday, Sept. 1 and extending through October during a concrete…...


kiro7.com > news > local > gridlock-traffic-i-405-wsp-says-one-exit-is-open > ER6TA734CNDCDGRXB3TSH7JY4U

Traffic on I-405: WSP closes on-ramp

2+ week, 1+ day ago   (136+ words) KIRO 7 News Seattle Traffic on I-405: WSP closes on-ramp According to the Washington Department of Transportation, the backup on I-405 in Bellevue is due to planned construction on the highway, with only one exit, Exit 70, open for drivers to get off the…...